The Team

Message from the President

The Intech Mechanical team consists of expert project management, estimating and design departments, along with our highly trained field personnel. Together, we deliver the final product to our clients in a timely and professional manner. With this extensive experience in the marketplace, we understand the needs of our clients, from the inception of a project, all the way through commissioning and warranty. Going into projects with the client’s perspective, helps us focus on meeting their requirements, just as we would want ours met. As a mid-sized contractor, our clients benefit by working directly with one of the decision-makers, versus a lower tiered employee, who may not be as interested in the project outcome.

RICKWEB

Rick Chowdry

President

Rick Chowdry has over 30 years of experience in plumbing and pipefitting (18 in project management and estimating). This includes field experience in heavy commercial projects, hospitals, university laboratory, office buildings, etc. He has extensive knowledge of plumbing, hydronic and medical gas systems, and experience with fuel systems. His administration and management experience includes estimating, project management, design build work at the conceptual phase, design, drafting, pricing and management through completion. As Founder and President of Intech Mechanical, Rick is a hands-on leader who oversees company operations, utilizing these years of experience. Rick’s leadership, communication and people skills are why he is able to develop strong relationships with General Contractors and Owners, as well as the growing team that is Intech Mechanical.

Mike Friesen 2018

Mike Friesen

Vice President of Operations

Mike Friesen brings over 30 years of Senior Project Management experience in commercial and industrial HVAC to Intech Mechanical.

Facilities Project Experience:
Hospital new and remodel – OSHPD, Medical office building design build and design assist, University – Office/Administration and laboratory, data & communications, technical manufacturing, commercial office, schools, medical, Public Works, Air Force bases (McClellan, Beale and Travis and Mare Island), Sacramento Army Depot, Aerojet and Gencorp. He’s worked in mechanical project management, estimating, field engineering, Superintendent for plumbing and piping design build, field & shop metal fabrication, and Heavy Commercial Construction Practices.
Mike honed his skills with Air Systems of Sacramento, Perryman Mechanical, Foley-PMI, Inc. and Wismer & Becker/Guy F. Atkinson, Inc. The year Mike joined Intech Mechanical was the same year that they became the company to watch.

SMACNA's Annual Convention is its premier event that blends exceptional education with world-class networking and social events. This year’s convention is held at The JW Marriott Phoenix Desert Ridge Resort & Spa in Phoenix, Arizona held from October 15-18 2023. The Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA) is an international trade association representing 1,834 member firms in 97 chapters throughout the United States, Canada, Australia, and Brazil.  A leader in promoting quality and excellence in the sheet metal and air conditioning industry, SMACNA has offices in Chantilly, VA. For more information go to smacna.org. Photography by Steve Exum & Jaclyn Burniche of exumphoto.com.

Gary Myers

Vice President Marketing and Business

Gary Myers brings 25 years of corporate and HVAC project management experience to our firm. His career started in the late 1980s with Western Air and Refrigeration where he was the project manager for numerous HVAC projects in southern California. In 1996 he joined Airco Mechanical in Sacramento and was Vice President of Construction until 2009 when he joined Intech. His specific project experience includes hospital projects for Sutter Health and Kaiser along with laboratories at UC Davis and other projects that span the spectrum of complexity and range from plan/spec to design build. His strong leadership and extensive HVAC experience complement the strengths of the rest of the team producing a group with expertise across the gamut of HVAC, plumbing and piping

Pansy Romo Side 2021 website

Pansy Romo

Vice President Construction

Pansy leads the Construction division of our Sacramento headquarters, which includes the project management group, field labor, safety & supply chain management. She is a hands-on leader and brings over 18 years’ experience to the team in both Mechanical Contracting and the  General Contracting fields. Her experience includes design build and design assist contract delivery, as well as coordination, project management, labor relations, construction operations. Pansy’s background and experience provides Intech Mechanical with an experienced diversified leader.

carlos

Carlos Cabrera

Controller

Lily Gonzalez

Lili Gonzalez

HR / Payroll Manager

Lili Gonzalez is a Certified Payroll Professional who brings more than 15 years of payroll and human resources experience to Intech Mechanical. As the HR/Payroll manager, Lili is responsible for managing the payroll operations and ensuring compliance with laws and regulations. Her ability to connect with employees both in the office and the field play an integral role in maintaining trust and confidence between the management team and staff.

Brian Featherston

Brian Featherston

Director of Engineering

Paul Caldwell

Paul Caldwell

Precon Manager

Paul is a proud veteran of the USMC and has over 20 years’ experience as a Union Sheet Metal worker.   He joined Intech in 2014 and has been a valued team member as a Foreman, General Foreman, HVAC Preconstruction and Pre-Con Manager. Paul uses his field experience, understanding of mechanical design, and knowledge of current code requirements to assist design and construction teams in translating mechanical design into practical, cost conscious installations.  When working with project teams, Paul believes teamwork, communication, and the drive to do what is right, are the foundation to success.

IMG_8051

Don Grimes

SPD Manager

Sean Paul

Senior Plumbing Estimator

Sean joined Intech Mechanical in 1996 as a delivery driver and then became our first Purchasing Manager. After three years, he was trained in Autocad, design and estimating, and progressed into doing all of our design build projects, as well as estimating.
Sean is currently our primary estimator and his work ethic and attention to detail make him one of Intech’s most valuable assets.

Scott Boddy close

Scott Boddy

Senior Piping Estimator

Scott Boddy brings over 42 years of construction experience including 12 years’ experience as union plumber – pipefitter. He has been with Intech since 2014. As a Senior Plumbing and Piping estimator, Scott is responsible for all the plan take offs and pricing for Plumbing and Piping projects. Scott has estimated numerous projects including, hospital, prison, water treatment plants, schools and military projects. In addition, he works hand and hand with the Project Mangers to help with change orders, budgets, and buyouts as well as engineers on Design Build and Design Assist projects.

SCOTTWEB

Scott Martello

Safety Manager/Training Development

Scott brings over 30 years’ experience to Intech Mechanical. In his 10 year career as Production Manager with Motivational Systems Inc, Scott managed all shop staff including drivers, installers, production artists, purchasing, estimating.
Scott also succeeded in his position, supervising production sales, inventory control, product quality, scheduling, meeting division margins and financial goals.
In 2010 Scott started as the Warehouse Foreman and Fleet Manager with Intech Mechanical.
His position has now evolved over the years to include all the facility maintenance and manages the material coordinators.
Recently Scott was promoted to Safety Manager.
He is a true leader, managing his team with an enthusiastic “can do” attitude.

Ricky Ramos

Ricky Ramos

BIM Manager

Ricky Ramos has over 14 years of experience as a union plumber/pipefitter. 9 years of field experience with the last 5 focused on designing, modeling and coordinating plumbing and piping systems for pre-fabrication and install. He has been with Intech since 2014. As the VCS Manager, Ricky leads the modeling staff for assigned projects. Ricky works in conjunction with the Project Managers to provide direction and guidance to the modeling team to ensure that the modeling and coordination activities remain in alignment with the project budget, established scope and BIM execution plan.

Gary Risse

Gary Risse

Lead Plumbing Designer

Gary joined Intech Mechanical in 2011 after devoting 35 years to a family mechanical contracting business. During those years he held many positions from delivery person to Vice President. He brings many skills to Intech including estimating, project management and detailing. His most notable characteristics are his integrity and attention to detail not only while estimating but especially during planning and construction. His commitment to working with excellence and integrity make him a valued asset to the firm.

Jon Pierce_01 (002)

Jon Pierce

Business Development/Precon

Dan Myers

Dan Myers

Start Up & CX Manager

Marty GatlinMEMORIAM

In memory of Marty Gatlin, a long time employee and friend of Intech Mechanical.  You will be greatly missed. “We make a living by what we get, but we make a life by what we give.” – Winston Churchill

Genaro2

In memory of Genaro Cuellar, a team leader and confidant of Intech Mechanical. You will be missed by all you acquainted. “In the end, it’s not the years in your life that count. It’s the life in your years.” –Abraham Lincoln

©2024 Intech Mechanical

Log in with your credentials

Forgot your details?